Mission

The Fermilab Accelerator Division Main Injector department is responsible for the Main Injector and Recycler accelerators as well as the 8 Gev injection line, and P1/P2 extraction lines. Our current goals include:
- Establish slip stacking in the Recycler and deliver 800 KW of beam power to the NuMI target
- Provide beam to Switchyard Experiments
- Provide beam with the appropriate time structure to the Muon Campus
- Minimize and control beam losses in the MI tunnel
New Record!
The Main Injector reached a record beam power average of 757.75 kW for one hour on April 04, 2019. See all Accelerator Division records here.- Last modified
- 28OCT20